Coastal Infrastructure Corridor – Integrated Ground Risk Framework
Multi-disciplinary geological, geotechnical, and environmental assessment supporting a new strategic transport link.
PIRAN GEOSCIENCE LTD led the ground model development for a 28 km coastal transport corridor in the south-west of England, combining legacy data, targeted field mapping, shallow geophysics, and borehole investigation to de-risk alignment selection in highly variable lithologies.
Scope of work
- Baseline geological mapping and structural interpretation.
- Targeted rotary cored boreholes and trial pits along critical sections.
- Preliminary slope stability and rockfall hazard assessment.
- Hydrogeological conceptualisation informing drainage strategy.
Measured outcomes
- 25% reduction in provisional earthworks quantities through route optimisation.
- Identification and mitigation of previously unrecognised karstic features.
- Clear evidence base enabling planning consent for the preferred alignment.